|
|
|
|
|
|
|
Rating
Summary:
|
0 out of 5 stars, based on 0 visitors. |
Name:
|
2004-10-16 (02).JPG |
Created
Date:
|
9/1/2006 |
Author:
|
|
Description:
|
Yup, that's what we need on this project - lotsa directors and no workers! Notice that we are moving all the boulders with forks on the loader. This proves to be the easiest way to get the rocks where we want them. The two orange pipes are called "inter-duct". and was installed to all planting zones, as was an irrigation pipe. These will be inter-connected with some cool electronics and controlled by a web site program that will control all watering and lighting for the landscape. More on this later... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|